697437
37
Zoom out
Zoom in
Previous page
1/52
Next page
5
Commissioning the heating system
Logano GE615 - Subject to technical modifications.
37
5.1.1 Creating operating pressure (sealed
heating systems)
On sealed heating systems the pressure gauge marker
must be within the green field.
B Set the red needle on the pressure gauge to the
required operating pressure (at least 1 bar
overpressure).
B Top up the heating water via an approved WRAS
method d.
B Vent the heating system during filling.
Fig. 57 Pressure gauge for sealed unvented systems
1 Red needle
2 Pressure gauge needle
3 Green band
5.1.2 Setting the capacity (open heating systems)
In open systems, the hydrometer needle must lie within
the red field.
B Set the green needle on the hydrometer to the required
capacity.
B Top up the heating water or drain via the boiler fill and
drain valve until the required capacity has been
reached.
Fig. 58 Hydrometer for open systems
1 Hydrometer needle
2 Green needle
3 Red band
5.2 Start up the control unit
Please see the accompanying technical documentation
for the 4000 series control unit for information about on
how to start it up.
5.3 Starting the burner
B When commissioning the burner, follow the
instructions in the technical documentation enclosed
with the burner.
B Fill out the burner commissioning report.
6304 4901-04.0K
37


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Buderus Logano GE615 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Buderus Logano GE615 in the language / languages: English as an attachment in your email.

The manual is 3,05 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Buderus Logano GE615

Buderus Logano GE615 User Manual - German - 12 pages

Buderus Logano GE615 User Manual - Dutch - 12 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info