697436
14
Zoom out
Zoom in
Previous page
1/20
Next page
14
Operating instructions Oil- and gas-fired special boilers Logano GE515 • Issue 02/2006
We reserve the right to make any changes due to technical modifications.
System maintenance7
7.2 Checking and correcting the water pressure
Your heating system must contain sufficient water to
ensure the functionality of your system.
Fill make-up water into your system, if the system
pressure is too low (see chapter 3 "Using correct fill and
make-up water", page 8).
7.2.1 When do you need to check the water
pressure in your heating system?
Recently introduced make-up water loses much of its
volume in the first few days because it releases
gases. With new systems, therefore, check the water
pressure in your heating system initially on a daily
basis, and thereafter at increasing intervals.
Check the water pressure monthly, if the heating
system still loses volume.
CAUTION!
SYSTEM DAMAGE
through frequent re-filling.
The system may be damaged, depending
on water quality, by corrosion and scaling,
if you frequently need to re-fill your system
with make-up water.
z Notify your local installer, if you
regularly need to add make-up water to
your system.
USER NOTE
Air pockets may form through the fill or
make-up water releasing gases.
z Vent the system via the radiators and, if
required, replenish the system with
make-up water.
14


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Buderus Logano GE515 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Buderus Logano GE515 in the language / languages: English as an attachment in your email.

The manual is 0,41 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Buderus Logano GE515

Buderus Logano GE515 Installation Guide - English - 68 pages

Buderus Logano GE515 User Manual - Dutch - 16 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info