697436
10
Zoom out
Zoom in
Previous page
1/20
Next page
10
Operating instructions Oil- and gas-fired special boilers Logano GE515 • Issue 2/2006
We reserve the right to make any changes due to technical modifications.
System start-up4
4 System start-up
This chapter explains, how you prepare the system for
operation and how to commission the control unit and
the burner.
4.1 Making the system operational
You should check the following to prepare the system for
operation:
z the system water pressure (see chapter 7.2
"Checking and correcting the water pressure",
page 14),
z whether the fuel supply to the main fuel shut-off valve
is open,
z whether the heating system emergency stop switch
is switched on.
Let your specialist show you where the fill valve is
located in the pipework of your system (return).
4.2 Commissioning the control unit and
the burner
Start up your boiler via the control unit (in this example,
Fig. 3: series 4000 control unit). By commissioning the
control unit, you also automatically commission the
burner. The burner can then be started via the control
unit. For further details in this connection, see the
operating instructions of the relevant control unit or
burner.
z Switch the boiler water thermostat (Fig. 3, item 1) to
"AUT" (Automatic).
z Set the On/Off switch (Fig. 3, item 2) to "I" (ON).
Fig. 3 Control unit (for example: Logamatic 4000)
Item 1: Boiler water thermostat
Item 2: On/Off switch
21
USER NOTE
z Please observe the operating
instructions of the control unit.
10


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Buderus Logano GE515 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Buderus Logano GE515 in the language / languages: English as an attachment in your email.

The manual is 0,41 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Buderus Logano GE515

Buderus Logano GE515 Installation Guide - English - 68 pages

Buderus Logano GE515 User Manual - Dutch - 16 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info