737215
8
Zoom out
Zoom in
Previous page
1/24
Next page
6
Step 3 - Attach the Squat Platform to the Main
Assembly
Locate the following items:
• From Step 2 - Base Platform/Lat Tower (Main) Assembly
Item #5 - Squat Platform
Item #I - (2) 3/8" X 3 1/4" Button Head Screws
Item #N - (4) 3/8" Washers
Item #O - (2) 3/8" Nylock Nuts
Item #Q - (4) Bolt Covers
With the Base Frame/Lower Lat Tower (Main) Assembly
(from Step 2) on the floor, carefully lift up the front of
the unit, then slide the Squat Platform (Rubber-pad side
down) underneath both Legs.
Line up the bolt holes in the brackets on the Squat
Platform with the bolt holes on each Leg (directly
behind the pulleys), as shown in Figure 3a.
Place (2) 3/8" Washers (Item #N) over the ends of (2) 3/8" X 3
1/4" Button Head Screws (Item #I) - one washer per screw.
Insert the screws through the lined-up holes as shown,
then place (2) 3/8" Washers and (2) 3/8" Nylock Nuts (Item
#O) over the end of each screw, securely tightening them in
place.
Completely tighten hardware installed during Step 3.
Place (2) Bolt Covers (Item #Q) over the Nylock Nuts installed
in this step - one cover per nut. Then, place (2) additional
Bolt Covers over the J-bolts, one cover per bolt, that attach
the Pulleys to the Leg, as shown in Figure 3b
.
Figure 3b
Q
Figure 3a
O
5
Base Platform/Lower
Lat Tower Assembly
N
I
Squat
Platform
Brackets
Bolt
Holes
Leg
Assembly Guide
8


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Bowflex Blaze Home Gym at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Bowflex Blaze Home Gym in the language / languages: English as an attachment in your email.

The manual is 4,94 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Bowflex Blaze Home Gym

Bowflex Blaze Home Gym User Manual - English - 80 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info