697424
21
Zoom out
Zoom in
Previous page
1/28
Next page
Commissioning, inspection and maintenance reports | 21
6 720 811 270 (2015/04)AGS10-2, AGS10E-2, AGS20-2, AGS50-2
General information on the solar system
User: System location:
Collector type: Number of collectors:
Collector array alignment (e.g. south): Collector array angle of inclination:
Collector installation (vertical, horizontal): Installation set (e.g. on roof):
Solar pump station type: Static height to collectors:
Expansion vessel size (l): Expansion vessel pre-charge pressure (unloaded):
Pressure relief valve type: Pressure relief valve excess pressure:
Controller type: Number of consumers (cylinder, swimming pool, etc.):
Cylinder 1 type and capacity: Cylinder 1 coil capacity:
Cylinder 2 type and capacity: Cylinder 2 coil capacity:
Miscellaneous:
Table 15
Commissioning, inspection and maintenance tasks Page
Commission-
ning
Inspection/maintenance
1. 2. 3. 4.
Date:
Solar thermal system
1. Pipework (flow and return) installed and earthed? 8
2. Pipework flushed and tightness test carried out? 13
3. Air vent closed? 14
4. Charge pressure of the expansion vessel checked? 11 ____ bar
5. Solar system verified to be free of air? 14
6. pH level of heat transfer fluid checked? Replace heat transfer fluid if value is
7 (heat transfer fluid coloured brown, strong odour).
1)
7. Frost protection to _______ °C checked and analysed? 15 ___ °C ___ °C ___ °C ___ °C ___ °C
Frost protection ensured until ________ (month/year)
(check frost protection at least every two years!)
8. Thermostatic DHW mixing valve functioning correctly (if installed)?
Solar station
1. Measure operating pressure when system is cold and enter the result here.
System temperature on return thermometer?
14 ____ bar
____ °C
___ bar
___ °C
___ bar
___ °C
___ bar
___ °C
___ bar
___ °C
2. Flow rate checked when the system is cold and result entered here? 15 ___ l/min __ l/min __ l/min __ l/min __ l/min
3. Gravity brakes ready to operate (closed)?
4. System adequately ventilated using air separator and air vent on roof (if
installed)?
Table 16
21


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Bosch AGS10E-2 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Bosch AGS10E-2 in the language / languages: English as an attachment in your email.

The manual is 2,38 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info