784209
9
Zoom out
Zoom in
Previous page
1/36
Next page
9
Installation
6005735_0 – 31.03.2021
EN
3. Installation
3.1 Safety instructions for installation
DWARNING!
Hazard through disregard of the installation instructions!
This chapter contains important information for the safe
installation of the device.
Read through this chapter carefully before installing the
device.
Follow the safety instructions.
Carry out the installation as described.
yInstallation only by qualified specialist personnel.
D“1.2 Authorised target groups” (page 4).
yElectrical work must only be undertaken by qualified
electricians.
D“1.2 Authorised target groups” (page 4).
yInstallation requires two persons.
yWhen working at heights, ensure good stable footing
(e.g. stable stepladder).
yThe hob and other parts that can be touched must be
allowed to cool prior to installation.
yStore the film or other parts of the packaging in a location
which is inaccessible to children.
yThe device must be in an undamaged and fault-free
condition prior to installation.
yCables must not be kinked, crushed or damaged.
yNever open the fan housing.
yIt is not permissible to attach further components
(e.g. panels, air ducts) to the device.
yThe power supply voltage must match the voltage
information quoted on the ratings plate.
D“2.5 Technical data” (page 8).
yEnsure that the power supply is stable and remains so
prior to the installation.
Connect the power supply only when instructed to do so
in the installation instructions.
3.2 Requirements for the installation location
DWARNING!
Risk of death due to improper installation!
Disregard of the ambient conditions can lead to hazardous
situations, e.g. in the handling of electrical power or gas.
Make sure that the requirements for the installation
location are complied with.
yDo not install in potentially explosive atmospheres.
yWith simultaneous use of a heating point which uses air
from the room as its oxygen supply (e.g. chimneys):
yA safety device is absolutely essential.
yThe safety device must prevent gases being drawing
to the room.
y It is essential to ensure that the negative pressure in
the heating point installation room does not exceed
4 Pa.
yAn approval for commissioning (e.g. from a chimney
sweep) must be available.
y Installation is only permitted on structural building
elements capable of bearing the load (solid structure).
yThe ceiling must be level and horizontal.
yIf it is necessary to break through the wall:
A wall break-through influences the structural integrity
of the building. This work must only be carried out by a
specialist.
yIf installed above fireplaces that use solid fuels (e.g. coal
stove):
The fireplace must have a sealed cover which cannot be
removed. Otherwise there is a fire risk due to flying sparks.
Applicable legal and country-specific regulations must be
observed.
yThe air flowing out must be able to dissipate unimpeded.
Do not impede the air flow, e.g. through the installation of
objects on or at the device.
yMake sure that the building electrical supply is properly
earthed.
yThe power supply voltage present must match the
voltage information quoted on the ratings plate.
yFor the supply of power, the customer must provide an
approx. 80 cm long connection cable in the vicinity of the
hood installation.
yThe mains plug must be accessible after the installation
of the hood. Alternatively, all-pole isolating device (with a
contact gap of at least 3 mm) must be provided.
Country-specific, legal provisions must be observed.
9


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Berbel BIH 100 GL at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Berbel BIH 100 GL in the language / languages: English as an attachment in your email.

The manual is 19.87 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Berbel BIH 100 GL

Berbel BIH 100 GL User Manual - German - 36 pages

Berbel BIH 100 GL User Manual - Dutch - 36 pages

Berbel BIH 100 GL User Manual - French - 36 pages

Berbel BIH 100 GL User Manual - Italian - 36 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info