6.2. Verification activities before start-up
The following checks must be performed before start-up:
a) Filling the heating system with water
The water used for filling boiler and heating systems must be clear and colourless, without suspended
solids, oil and aggressive chemicals. Its hardness must comply with ČSN 07 7401: 1992 and it is
essential that in case the water hardness does not comply, it must be treated. Even multiple heating of
water with a higher hardness does not stop salt build-up on the walls of the exchanger. 1 mm of calcite
reduces the heat transfer from metal to water at the given point by approximately 10%.
Heating systems with an open expansion tank allow direct contact between the heating water and the
atmosphere. During the heating season the water expanding in the tank absorbs oxygen which increases
corrosion and at the same results in significant water evaporation. Refilling can only be performed with
water treated according to ČSN 07 7401:1992. The heating system must be thoroughly flushed in order to
wash out all impurities.
During the heating season it is necessary to maintain a constant volume of water in the heating system.
When refilling the heating system with water no air must be sucked into the system. The boiler and
heating system water must never be discharged or taken for use except in emergencies like repairs etc.
Water discharge and filling with new water increases the danger of corrosion and scaling.
If it is necessary to refill the heating system with water only do this when the boiler is cold to
prevent damage to the steel heat exchanger.
b) Heating system tightness
c) Connection of emergency fire-fighting equipment to the water distribution system
d) Connection to the chimney - must be approved by a chimney sweeping company
e) Ceramic reflector of BENEKOV S16 and S26 boilers (fig. no. 24, pos. 7) fitted into the combustion
chamber of the burner, i.e. laid on the obliquely welded beams (8) in the boiler body and attached to the
back wall of the combustion chamber.
Ceramic reflector of BENEKOV S51 boiler (fig. no. 25, pos. 7) fitted into the combustion chamber of the
burner, i.e. laid on the horizontally welded beams (8) in the boiler body and attached to the back wall of
the combustion chamber.
f) Electric connection
The assembly completion and heating test must be recorded in the "Guarantee certificate".
6.3. Putting into operation
1. Fire the boiler.
2. Bring the boiler to operating temperature. The recommended operating temperature of the output
heating water is 65 to 80 °C.
3. Check the boiler tightness again.
4. Carry out the heating test according to relevant standards (see the Guarantee certificate)
5. Acquaint the user with the boiler operation - see chapter 7.
6. Make a record in the Guarantee certificate.
29


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Benekov S51 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Benekov S51 in the language / languages: English as an attachment in your email.

The manual is 1,69 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info