571998
13
Zoom out
Zoom in
Previous page
1/96
Next page
13
Bell res English
Installation instructions
Use as a wall support Use as a fl oor support
36
36
1.6 GENERAL SERVICES
1.6.1 The Fume Channel/Combustion Air Intake
The combined fume channel and combustion air intake requires one of the following
concentric fl ue system confi gurations.
Important: Due to the high temperature of the outer walls
(approx. 150°C), no fl ammable materials may be located
or used in the vicinity of the fl ue system.
The complete fl ue system, must therefore be sleeved
with a heat resistant material after assembly.
Ventilate the covered concentric fl ue by fi tting a
grid near the fl oor and ceiling (on each fl oor).
Do not insulate the concentric fl ue.
Use the universal wall/fl oor support Ø150 mm
to attach the covering of the concentric fl ue system
[Ø100 mm - Ø150 mm], see 1.6.2, drawing number 36.
Figure 3: Application universal wall/fl oor support Ø150 mm
13


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Bellfires Vertical Bell Medium Tunnel 3 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Bellfires Vertical Bell Medium Tunnel 3 in the language / languages: English as an attachment in your email.

The manual is 2.79 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Bellfires Vertical Bell Medium Tunnel 3

Bellfires Vertical Bell Medium Tunnel 3 User Manual - English - 32 pages

Bellfires Vertical Bell Medium Tunnel 3 Installation Guide - German - 108 pages

Bellfires Vertical Bell Medium Tunnel 3 User Manual - German - 32 pages

Bellfires Vertical Bell Medium Tunnel 3 Installation Guide - Dutch - 96 pages

Bellfires Vertical Bell Medium Tunnel 3 User Manual - Dutch - 28 pages

Bellfires Vertical Bell Medium Tunnel 3 Installation Guide - French - 96 pages

Bellfires Vertical Bell Medium Tunnel 3 User Manual - French - 32 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info