812743
26
Zoom out
Zoom in
Previous page
1/44
Next page
5.1.2 Do a check on the appliance
1. Do a check for leaks on the gas pipes and the gas pipe connections. Refer to
4.2.4
.
2. Make sure that the pilot light operates correctly. The pilot light must not show any
anomalies.
3. Make sure that the main burner operates correctly. The fire must not show any
anomalies.
4. Do a check of the gas supply pressure and the burner pressure.
a) Use the inlet pressure tap and outlet pressure tap on the gas regulator block to
measure the supply pressure and the burner pressure.
b) Measure the pressure when the appliance is off and when the appliance burns
on maximum. Refer to
7
for the required supply pressure and burner pressure.
5. Make sure that the ambient lighting operates correctly. Refer to the user manual.
6. If the convection fan is installed in the appliance, make sure it works correctly. Refer
to the user manual.
7. Do a check on the concentric flue system and the outlet construction. Make sure that
all the connections of the concentric flue system are secure.
5.2 Maintenance procedures
5.2.1 Remove the door (including glass)
1. Turn off the gas supply to the appliance before removing the door.
2. With the hook, pull the thin, metal spring strips on the top left and right from the studs
on the door.
Maintenance
26 Smart Bell 75-55
26


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Bellfires Smart Bell 75-55 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Bellfires Smart Bell 75-55 in the language / languages: English as an attachment in your email.

The manual is 12.5 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Bellfires Smart Bell 75-55

Bellfires Smart Bell 75-55 Additional guide - English - 48 pages

Bellfires Smart Bell 75-55 User Manual - English - 32 pages

Bellfires Smart Bell 75-55 Additional guide - German - 48 pages

Bellfires Smart Bell 75-55 Installation Guide - German - 52 pages

Bellfires Smart Bell 75-55 User Manual - German - 36 pages

Bellfires Smart Bell 75-55 Additional guide - Dutch - 48 pages

Bellfires Smart Bell 75-55 Installation Guide - Dutch - 52 pages

Bellfires Smart Bell 75-55 User Manual - Dutch - 36 pages

Bellfires Smart Bell 75-55 Additional guide - French - 48 pages

Bellfires Smart Bell 75-55 Installation Guide - French - 48 pages

Bellfires Smart Bell 75-55 User Manual - French - 32 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info