812729
24
Zoom out
Zoom in
Previous page
1/84
Next page
Alternative without a false ceiling: Make an open space of minimum 50 cm height
between the chimney enclosure top side (complete width and depth of the enclosure) and
the flammable ceiling
Figure 12 shows the minimum thickness of the insulation plates and the minimum
clearances to a flammable ceiling
Make sure the total area of the convection air outlet opening is minimum 300 cm2.
1 Chimney enclosure
2 Convection air outlet opening
3 Flammable ceiling
4 Insulation plate (false ceiling)
5Insulation plates
Figure 12. Clearances to flammable ceiling - Front view
Table 5: Minimum dimension and clearance to flammable ceiling
With false ceiling, minimum
25 mm thickness
Without false ceiling
hArea of the convection air
outlet opening Minimum 300 mm2
Minimum 50 cm open
space between ceiling and
chimney enclosure
H
Height of the false ceiling
minimum distance convec-
tion air outlet opening -
flammable ceiling
Minimum 12.5 cm (= 10 cm
free space + 25 mm false
ceiling)
Not applicable (the top side
of the chimney enclosure is
open with a clearance of
minimum 50 cm to the flam-
mable ceiling.
4.5 Clearances to non-flammable walls
Put a non-flammable insulation plate between the appliance and the rear wall and side
wall according figure 3.
Clearances
24 Gas Fire Panorama 70-70
24


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Barbas Gas Fire Panorama 70-70 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Barbas Gas Fire Panorama 70-70 in the language / languages: English as an attachment in your email.

The manual is 2.64 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Barbas Gas Fire Panorama 70-70

Barbas Gas Fire Panorama 70-70 Additional guide - English - 100 pages

Barbas Gas Fire Panorama 70-70 User Manual - English - 32 pages

Barbas Gas Fire Panorama 70-70 Additional guide - German - 104 pages

Barbas Gas Fire Panorama 70-70 Installation Guide - German - 92 pages

Barbas Gas Fire Panorama 70-70 User Manual - German - 36 pages

Barbas Gas Fire Panorama 70-70 Additional guide - Dutch - 100 pages

Barbas Gas Fire Panorama 70-70 Installation Guide - Dutch - 88 pages

Barbas Gas Fire Panorama 70-70 User Manual - Dutch - 36 pages

Barbas Gas Fire Panorama 70-70 Additional guide - French - 100 pages

Barbas Gas Fire Panorama 70-70 Installation Guide - French - 88 pages

Barbas Gas Fire Panorama 70-70 User Manual - French - 36 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info