812721
26
Zoom out
Zoom in
Previous page
1/84
Next page
Figure 14 shows the minimum thickness of the insulation plates and the minimum
clearances to a non-flammable ceiling
Make sure the total area of the convection air outlet opening is minimum 440 cm2.
1 Chimney enclosure
2 Convection air outlet opening
3 Non-Flammable ceiling
4 Insulation plate (false ceiling)
5 Insulation plates
Figure 14. Clearances to non-flammable ceiling - Front view
Table 7: Minimum dimension and clearance to non-flammable ceiling
With false ceiling, minimum
25 mm thickness Without false ceiling
hArea of the convection air
outlet opening Minimum 440 cm2
Minimum 20 cm open space
between ceiling and chim-
ney enclosure
H Height of the false ceiling Minimum 25 mm (= thick-
ness false ceiling)
Not applicable (the top side
of the chimney enclosure is
open with a clearance of
minimum 20 cm to the ceil-
ing.
A
Distance between convec-
tion air outlet opening and
ceiling
Minimum 13 cm
Minimum 20 cm open space
between ceiling and chim-
ney enclosure
Clearances
26 Gas Fire Front 70-75
26


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Barbas Gas Fire Front 70-75 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Barbas Gas Fire Front 70-75 in the language / languages: English as an attachment in your email.

The manual is 11.81 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Barbas Gas Fire Front 70-75

Barbas Gas Fire Front 70-75 Additional guide - English - 96 pages

Barbas Gas Fire Front 70-75 User Manual - English - 36 pages

Barbas Gas Fire Front 70-75 Additional guide - German - 100 pages

Barbas Gas Fire Front 70-75 Installation Guide - German - 92 pages

Barbas Gas Fire Front 70-75 User Manual - German - 40 pages

Barbas Gas Fire Front 70-75 Additional guide - Dutch - 100 pages

Barbas Gas Fire Front 70-75 Installation Guide - Dutch - 88 pages

Barbas Gas Fire Front 70-75 User Manual - Dutch - 36 pages

Barbas Gas Fire Front 70-75 Additional guide - French - 100 pages

Barbas Gas Fire Front 70-75 Installation Guide - French - 88 pages

Barbas Gas Fire Front 70-75 User Manual - French - 36 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info