800532
29
Zoom out
Zoom in
Previous page
1/62
Next page
29
Id.Nr.: 241525-1 DE - GB - F
GB
The safety valve must be set to a response pressure which is less than the rated pressure of the tank. Before nally connec-
ting the tank, ush the cold water line.
After making the water connection and air-bubble free lling of the tank, check the tting for proper function.
When lifting or turning (venting) the safety valve test button, the water must ow out freely and without backing up through
the expansion water outlet funnel.
To check the return valve, the shut-off valve must be closed and no water may ow out from the opened test valve. The
safety valve must be checked according to DIN 1988-8 or ÖNORM B 2531-1.
The water heater is operated using the hot water valve on the service water tting. This means the tank is under continuous
line pressure. To protect the internal boiler against overpressure when heating up, the expansion water created is dispersed
through the safety valve every time it is heated. The return valve prevents hot water from owing back into the cold water line
when there is a pressure drop and thus protects the boiler from heating when no water is present.
The shut-off valve can be used to isolate the tank on the water side and thereby eliminate the pressure from the cold water
supply, also allowing use of the waste valve when necessary.
6. CIRCULATION CONNECTION
Due to signicant energy loss, a circulation connection should be avoided when possible. If a highly branched service
water network requires a circulation line, this must be well insulated and the circulation pump controlled via a timer and
thermostat. The switching temperature of the thermostat should be kept low (45°C). The circulation connection piece has
an external thread.
7. FLANGE INSERTION OPENING
Depending on the system design, electric built-in heaters or heat exchangers can be installed on the boiler ange Ø240
mm (clear diameter Ø173 mm, hole circle Ø210 mm, 12 x M12) and Ø180 (clear diameter Ø117 mm, hole circle Ø150
mm, 8 x M12).
Built-in electric heating elements are to be installed so that the thermostat probe is at the top.
29


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Austria Email HRS 500 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Austria Email HRS 500 in the language / languages: English, German, French as an attachment in your email.

The manual is 6.23 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info