810507
9
Zoom out
Zoom in
Previous page
1/60
Next page
7
ASSEMBLY AND INSTALLATION OF BOILER
Installation of boiler
Only the person with valid approval for installation and assembly of the heat technology
devices can install the boiler. For installation it is necessary to elaborate a project in
conformity with the valid prescriptions. Technician must check, if information on data
plate comply with project and accompanying documentation, before doing the
installation. Boiler must be connected in con-formity with valid prescriptions, norms,
regulations and this manual. Manufacturer takes no re-sponsibility for damages caused
by incorrect connection, eventually by incorrect operation.
Placing of boiler
Boiler is intended for installation and operation in premises with elementary
environment (AA5/AB5) under the STN 33 2000-5-51. By boiler installation it is necessary
to keep safety distance of its surface from flammable materials in dependence on the
grade of flammability:
from materials of flammability B, C1, C2 200 mm
from materials of flammability C3 400 mm
from materials, which grade of flammability
has not been approved under the STN 73 0853 400 mm
The connection of these other elements is proposed by the designer according to the
specific conditions of the heating system. The electrical installation associated with the
boiler's additional equipment must be carried out by a specialist, in accordance with the
applicable standards.
Connection to electricity mains
Boiler is connected to el. mains 230 V / 50 Hz by plug with fork. Plug of M type has
to be replaced by service technician with the same type of plug. Appliance must be
placed in the way enabling attendance to reach the connection fork (under the
STN EN 60335-1+A11:1997). Connection of el. socket must be in conformity with
the STN 33 2000-4-46 norm. Socket must be equipped with middle protection stick,
connected to the PE conductor. It is not permitted to use different cable
distributors and extensions. Due to safety, power inlet must be freely
accessible, when being connected to the el. mains.
Flue connection
Flue connection must empty into chimney vent. If it is not possible to connect
boiler to chimney vent directly, appropriate extension of flue should be as short as
possible (not longer than 1 m), without additional heating area and it has to ascend
in direction towards chimney. Extensions of flue connection must be mechanically
firmly joined, tight against flue leakage and easily cleana-ble. Extensions of flue
connection cannot lead through foreign dwelling or utility units. It is nec-essary to
eliminate usage of elbows and horizontal parts.
Chimney
9


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for ATTACK Pellet 30 Automatic Plus at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of ATTACK Pellet 30 Automatic Plus in the language / languages: English as an attachment in your email.

The manual is 0.97 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of ATTACK Pellet 30 Automatic Plus

ATTACK Pellet 30 Automatic Plus User Manual - German - 56 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info