810547
11
Zoom out
Zoom in
Previous page
1/28
Next page
| 11
CAST IRON FLOOR STANDING GAS BOILER
CONNECTING THE BOILER TO THE ELECTRICITY MAINS NOT FOR ATTACK P BOILERS
Boilers are plugged into the electrical socket of 230 V/50 Hz placed near the boiler, with a supply
cable ended with a plug. In line with the ČSN EN 60 335-1, the plug must be approachable after the
boiler is installed. The socket must be adequately protected by zeroising or grounding and it must be
connected in line with the ČSN 33 21 80. The boiler and other parts of installation must be grounded.
Installation of the socket, room thermostat, circulation pump and service of electrical boiler parts can
be carried out only by a person with proper electrotechnical qualification, by the law No. 718/2002.
ELECTRICAL EQUIPMENT OF BOILERS
All the electroinstallation is placed on an insulating pad of the electrical board. On the front cover
there is a main switch, output switch (PLQ, KLQ), switch of failure unblocking (E, EZ), control button
of the boiler thermostat and thermomanometer. When the power supply fails, all the euipment
supplied with the power of 230 V is out of operation which means that a valve closes gas flow to
the burners. The flame of ignition burner (EKO, PLQ, P) is still burns and the boiler stays in a stand-
by mode. After the power supply starts again, the function starts automatically. Electrical installa-
tion is ready to connect the additional room thermostat, pump and switch contacts of three-way
valve. The room thermostat or the contacts of the three-way valve are connected after removing
the jumper on terminals 7, 8 and the circulation pump is connected to the terminals 3, 4, 5. By the
E boiler type is the room thermostat connected to the terminals 8, 9 and circulation pump to the
terminals 11, 12, 13. By the EZ boiler type is the room thermostat connected to the terminals 6, 7,
three-way valve to the terminals 3, 4, 5 and circulation pump to the terminals 12, 13, 14. Connection
of the room thermostat, circulation pump and three-way valve can be performed only by a person
with electrical qualification by the law No. 718/2002.
START  PUTTING THE BOILER INTO OPERATION
1. Remove the door.
2. Plug the flex cable into the electricity mains, the main switch is in the off position.
3. Open the gas supply to the boiler by a manual valve on the inlet pipe.
4. Set the required temperature of outlet water by knob of the thermostat.
5. The temperature is increased by turning the switch to the right (clockwise) and decreased by
turning the switch to the left (anticlockwise).
6. Press the control button of the gas combined electrical valve and hold it for 20 seconds. At the
same time press the button of piezo ignitor hardly for few times. Check the ignition burner
through the hole. ATTENTION – around the check hole there is a risk of burn when touch. Be
careful by work with the valve and piezo ignitor, not to get burned. Release the button of the
valve. The gas flows into the ignition burner and the sensor of thermo-couple is heated by flame.
If the flame is extinguishes, the process of ignition must be repeated (EKO, PLQ, P). By the KLQ,
KLV and EZ versions, are the burners ignited automatically after switching the main switch and
setting up the boiler thermostat.
11


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for ATTACK EKO at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of ATTACK EKO in the language / languages: English as an attachment in your email.

The manual is 1.22 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info