467217
13
Zoom out
Zoom in
Previous page
1/20
Next page
13
Operating instructions ATAG Q-Solar
Replenishing the central heating system
The central heating installation needs to be lled with potable (drinking) wa-
ter. For topping up the installation you use the lling loop according to the
following procedure:
(If in any doubt please contact your dealer)
1 Switch all functions off (heating, DHW and pump);
2 Briey push the 'STEP'-button: P x.x = water pressure in bar;
3 Slowly open the lling loop (Indication on display increases);
4 Fill up slowly to 1.5 to 1.7 bar;
5 STOP appears on the display;
6 Close the lling loop;
7 De-aerate the complete installation, start at the lowest point;
8 Check the water pressure and if necessary top it up;
9 Close the lling loop;
10 Activate functions required (heating , DHW and/or pump );
11 If A xx appears on the display, wait for 17 minutes;
12 Check the water pressure and if necessary top it up to 1,5 to 1,7 bar
13 Close the lling loop;
14 Press the ‘STEP’-button;
15 Be sure that the lling loop is closed.
After the automatic de-aeration programm (A xx) is nished the boiler will
return to the Good reading or Technical reading.
13


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for ATAG Q-Solar at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of ATAG Q-Solar in the language / languages: English as an attachment in your email.

The manual is 0,49 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of ATAG Q-Solar

ATAG Q-Solar Installation Guide - German - 44 pages

ATAG Q-Solar User Manual - German - 16 pages

ATAG Q-Solar Manual - Dutch - 2 pages

ATAG Q-Solar Installation Guide - Dutch - 44 pages

ATAG Q-Solar User Manual - Dutch - 20 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info