507731
18
Zoom out
Zoom in
Previous page
1/37
Next page
Installation instructions S-HR series page 18
11 Commissioning the boiler
Before the boiler is fired, ensure that the boiler and the
system are well vented and free of air. Purge the gas line
between the gas meter and the boiler and carry out a
gas soundness test as specified in the current Gas
Safety Regulations.
The boiler does not require adjustment of the burner
pressure and air quantity because it is self adjusting and
is factory set at the correct value.
11.1 Central Heating system
Provided there is a heat requirement from the
thermostat or control, the central heating program will
be put into operation by means of the key (central
heating program). The circulation pump will start
circulating and the boiler will start the burner.
11.2 Hot water supply
Provided there is a heat requirement from the cylinder
the hot water program will be put into operation by
means of the key (hot water program).
11.3 Adjustments
In the Control Tower a number of adjustments can be
made. These adjustments can be fed in easily by means
of the keys on the boiler. However, a distinction is made
between adjustments which are done by the user and
adjustments done by the installer.
At users level adjustments can only be made from the
technical read-out in other words from the display read-
out with the operating function and the water
temperature. Adjustments can not be made from the
indication.
The next two chapters are accessible after pressing the
Mode key:
Chapter 1
The normal operating functions such as the simple
read out or the technical with the
read out.
Chapter 2
The chapter in which adjustments can be made.
18


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for ATAG Blauwe Engel at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of ATAG Blauwe Engel in the language / languages: English as an attachment in your email.

The manual is 1,07 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of ATAG Blauwe Engel

ATAG Blauwe Engel Manual - Dutch - 2 pages

ATAG Blauwe Engel Installation Guide - Dutch - 40 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info