694454
16
Zoom out
Zoom in
Previous page
1/36
Next page
2.0. BOILER POSITIONING AND ASSEMBLY
2.1. MINIMUM DISTANCE FROM THE ROOM WALLS
Figure 3. Minimum distance from the room walls for Polifuel
1
Boiler Polifuel
Chimney
Flue (Chimney connection; must be insulated)
-
-
2
A = 6,02 x Q
Each boiler room must be equipped with an opening for supply of fresh air which is dimensioned in
accordance with boiler output (minimum opening area according to the below shown equation). Such
opening must be protected with a net or grate. All installation works have to be performed in accordance
with valid national and European standards. Boiler must not operate in flammable and explosive
environment.
2.2. OPENING FOR FRESH AIR (FRESH AIR SUPPLY)
3
-
Boiler positioning, assembly and building in must be performed by a qualified person. We recommend that
boiler is placed on a concrete base with height of 50 to 100 mm above the floor. Boiler room must be frost-
proof and well ventilated. Boiler has to be positioned so that it can be properly connected to the chimney (see
Figure 2) and simultaneously, enabling tending of boiler and additional equipment, control during operation,
cleaning and maintenance.
WARNING!
Flammable items must not be placed on the boiler and within the minimum distances shown in
Figure 1.
Q - boiler output in kW
2
A - opening area in cm
1
-
-
2
3
-
min. 550 mm
min. 1500 mm
min. 450 mm
2
3
1
min. 300 mm
max 1500 mm
16
Technical instructions Polifuel
16


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Artel Polifuel 36 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Artel Polifuel 36 in the language / languages: English as an attachment in your email.

The manual is 24,61 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info