719960
47
Zoom out
Zoom in
Previous page
1/80
Next page
/ 47
MAINTENANCE
Important
Maintenance is an essential part of the safe and
efcient operation of the boiler and ensures its
durability. It should be performed according to the
instructions given in current legislation. Perform
combustion analysis regularly in order to check the
operating efciency of the boiler and to make sure
any polluting substances released are within the
boundaries set by current legislation.
Before beginning maintenance work:
- Disconnect the appliance from the electricity supply by
turning the external bipolar switch to the “OFF” position;
- Close the gas valve and the central heating and domestic
hot water system valves.
After the work has been completed the initial settings will be
restored.
General comments
It is recommended that the following inspections be
carried out on the boiler at least once a year:
1. Check the seals in the water part and, if necessary, replace
the gaskets and restore the seal to perfect working order.
2. Check the seals in the gas part and, if necessary, replace
the gaskets and restore the seal to perfect working order.
3. Visually check the overall condition of the boiler.
4. Visually check and, if necessary, disassemble and clean
the burner.
5. Following the inspection detailed in point “3”, disassemble
and clean the combustion chamber, if necessary.
6. Following the inspection detailed in point “4”, disassemble
and clean the burner, if necessary.
7. Cleaning the primary heat exchanger
8. Make sure the following heating safety devices are
operating correctly:
- temperature limit safety device.
9. Make sure that the following gas part safety devices are
operating correctly:
- absence of gas or ame safety device (ionisation).
10. Check the efciency of the domestic hot water production
process (test the ow rate and temperature).
11. Perform a general inspection of the boiler operation.
12. Remove oxide from the detection electrode using an emery
cloth.
13. These checks are not exhaustive. Further mechanical,
electrical and combustion maintenance checks may be
required.
Operational test
After having carried out the maintenance operations, ll the
heating circuit at a pressure of approximately 1.5 bar and release
the air from the system.
Fill the domestic hot water system at the same time.
- Begin operating the boiler.
- If necessary, release the air from the heating system again.
- Check the settings and make sure all the command,
adjustment and monitoring parts are working correctly.
- Check the ue system is sealed and operating correctly.
Draining procedures
The heating system must be drained using the following
procedure:
- Switch off the boiler, make sure the external bipolar switch is
in the OFF position and shut off the gas valve;
- Loosen the automatic air relief valve;
- Open the system drain off cock and collect the escaping water
in a container;
- Empty the water from the lowest points of the system (where
applicable).
If the system is to be left inactive in areas where the room
temperature may fall below 0°C during winter, we recommend
that anti-freeze liquid is added to the water in the heating system
in order to avoid the need for repeated draining; when this liquid
is used make sure it is compatible with the stainless steel used
for the bodywork of the boiler.
We recommend the use of anti-freeze products which contain
PROPYLENE GLYCOLS as these inhibit corrosion and that they
are used in conjunction with the anti-scaling and anti-corrosion
function, in the quantities suggested by the manufacturer, at the
mimimum temperature.
Regularly check the pH level of the water/anti-freeze mix in the
boiler circuit and replace it when the value measured is lower
than the limit prescribed by the manufacturer.
DO NOT MIX DIFFERENT TYPES OF ANTI-FREEZE.
The manufacturer will not be held liable for any damage caused
by the appliance or the system due to the use of inappropriate
anti-freeze substances or additives.
Draining the domestic hot water system and indirect cylinder
Every time there is a danger of freezing, the domestic hot water
system must be drained as follows:
- Shut off the water mains inlet valve;
- Open all the hot and cold water taps;
- Empty the water from the lowest points of the system (where
applicable).
WARNING
Before handling, empty all components which may contain hot
water, performing bleeding where necessary.
Descale the components in accordance with the instructions
provided on the safety data leaet supplied with the product
used, make sure the room is well ventilated, wear protective
clothing, avoid mixing different products, and protect the
appliance and surrounding objects.
Seal all openings used to take a gas pressure reading or to
make any gas adjustments.
If a smell of burning is detected or smoke is seen leaking from
the appliance, or there is a smell of gas, disconnect it from the
electricity supply, shut off the gas valve, open the windows and
call for technical assistance.
Cleaning the primary exchanger
Cleaning the combustion side
The inside of the primary exchanger is accessed by removing
the burner. Wash with water and detergent using a non-metallic
rie-type brush, rinse with water.
Cleaning the trap
The trap is accessed by emptying the condensate bowl located
in the bottom section. Wash with water and detergent.
Replace the condensate collection bowl in its housing.
NB: In the event of prolonged use of the appliance, the trap
must be lled before being used again.
A lack of water in the trap is dangerous and may cause pro-
ducts to be released into the atmosphere.
47


Need help? Post your question in this forum.

Forumrules
1

Forum

ariston-e-combi-one

Reset search

  • Is this the manual for the new Ariston E combi One 24 kw LPG Boiler that does not have a pressure gauge on the front panel ? Submitted on 11-8-2023 at 10:49

    Reply Report abuse


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Ariston E-Combi One at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Ariston E-Combi One in the language / languages: English as an attachment in your email.

The manual is 11,88 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Ariston E-Combi One

Ariston E-Combi One User Manual - English - 12 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info