665484
9
Zoom out
Zoom in
Previous page
1/25
Next page
9
GB
4 - CONNECTIONS
4.1 - REFRIGERATION CONNECTIONS
Outdoor unit
Indoor unit
Gas line
Liquid line
R 410 A
R 410 A is a high-pressure refrigerant (+ 50% in relation to
R 22 and R 407 C).
The compressors approved for operation with this fluid are
filled beforehand with polyalcohol oil.
Contrary to mineral oil, it is very hygroscopic: it absorbs the
humidity of the ambient air very quickly. This can modify its
lubricant properties and lead in time to the destruction of the
compressor.
MAINTENANCE INSTRUCTIONS
1 - Never add oil to the appliance; the compressor is filled
with polyalcohol oil, a special oil which cannot tolerate the
presence of other oils.
2 - The instruments used for:
- filling,
- pressure measurements,
- emptying under vacuum,
- recovering the fluid,
must be compatible and only used for the R 410 A fluid.
Note: the pressure taps of the refrigerating circuit are
5/16 SAE (1/2 - 20 - UNF).
3 - In the case of a new charge:
- the charge must be undertaken in liquid phase,
- use a balance and a dip pipe type R 410 A cylinder,
- charge the weight of R 410 A as per the value indicated
on the unit’s identification plate (for “split systems”, refer
to the installation instructions as the charge must
consider the length of the connecting lines).
4 - In case of leakage, do not complete the charge: recover
the remaining refrigerant for recycling and perform a total
charge.
Recovery, recycling or the destruction of the fluid must be
done in compliance with the laws in force in the country
concerned.
5 - If the refrigerant circuit is opened, you must:
- avoid the entry of air into the circuit as much as
possible,
- replace or install a drier,
- perform the “vacuum operation” at a minimum level of
0.3 mbar (static).
6 - Do not release R 410 A fluid into the atmosphere. This
fluid is a fluorinated greenhouse gases, covered by the
Kyoto Protocol with a Global Warming Potential (GWP) =
1975 - (CE Directive 842 / 2006).
APPLIANCES FILLED WITH R 410 A
For the connecting pipes, use the flare nuts provided with the unit or nuts intended for the R 410 A.
Connect the units with the connecting tubes in accordance with the table below.
For GR9FI65 - AEI1G65 connect the bypass, supplied with the outdoor unit.
Colonna1
HKBE HKCE HKDE
Connection to the refrigerant circuit
AAA
of outdoor unit
ø Liquid tube
1/4” 1/4” 1/4”
(6,35 mm) (6,35 mm) (6,35 mm)
ø Gas tube
1/2” * 1/2” 1/2”
(12,7 mm) (12,7 mm) (12,7 mm)
Minimum pipe length 3 m3 m3 m
addition of refrigerant load
SEE THE INSTALLATION INSTRUCTION OF
OUTDOOR UNIT
addition of refrigerant load
Additional load per meter
* For the connection with
GR9FI50 - AEI1G50 , use
the adapter, supplied with
the outdoor unit.
9


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Argo Hydrokit at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Argo Hydrokit in the language / languages: English as an attachment in your email.

The manual is 2,2 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Argo Hydrokit

Argo Hydrokit User Manual - English - 14 pages

Argo Hydrokit Installation Guide - German - 25 pages

Argo Hydrokit User Manual - German - 14 pages

Argo Hydrokit Installation Guide - French - 25 pages

Argo Hydrokit User Manual - French - 14 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info