665471
29
Zoom out
Zoom in
Previous page
1/76
Next page
5
A
Minimum operation and maintenance area.
Area minima di esercizio e manutenzione.
Surface minimum de fonctionnement et d’entretien.
Raumbedarf des Gerätes
.
Area mínima de funcionamiento y manutención.
Área mínima para o funcionamento e manutenção.
Elavcisto" cwvro" leitourgiva" kai sunthvrhsh"
I
EG
F
D
E
P
GR
250
250
3000
2000
250
250 250
max 400
3000
B
C
Find the place for the installation. The unit can be connected in four
different positions: at the right-back side, at the left-back side, at the
botton on the right or on the left.
Individuare la posizione di installazione. L'unità può essere collegata in
quattro direzioni: Posteriore destro o sinistro, dal basso destro o sinistro.
Chercher la position pour l'installation. L'unité peut être connectée vers
4 directions: derrière côté droit, derrière côté gauche, en bas côté droit,
en bas côté gauche.
Die Rohre können in vier Richtungen verlaufen: rechts hinten, links
hinten, rechts unten, links unten. Die Seite des Gerätes wählen, an der
Sie eine Öffnung machen.
Localizar la posición para la instalación. La unidad se puede conectar
en cuatro direcciones: lado posterior derecho o izquierdo, lado inferior
derecho o izquerdo.
Identificar a posição da instalação. A unidade pode ser ligada em quatro
direções: posterior direita ou esquerda, por baixo do lado direito ou
esquerdo.
Dialevxte th qevsh egkatavstash". H monavda mporeiv na sundeqeiv
se tevsserei" kateuquvnsei" Pivsw pleurav dexiav hv aristerav,
kavtw pleurav dexiav hv aristerav.
Floor installation.
Bend the fullscall diagram, level it and mark the holes to drill (pipes,
condensate drain pipe, cradle).
Installazione a pavimento.
Piegare la dima, metterla a livello ed evidenziare i fori da eseguire
(tubazioni - scarico condensa - squadretta supporto).
Installation au sol.
Placer le gabarit de perçage, le mettre de niveau et marquer les trous
à faire (tuyaux et cheville).
Installation auf dem Boden.
Die Schablone biegen, sie nivellieren und die zu schneidenden Löcher
zeichnen (Rohre, Kondenswasser-Auslaß-Rohr, Tragwinkel).
Instalación en el suelo.
Doblar la plantilla, nivelar, marcar los taladros que hay que realizar
(tuberias-descarga condensación-angular de apoyo).
Instalação ao chão
Dobre o contôrno da unidade, nivele-o e ponha os furos a serem feitos
em evidência (tubagens, esgoto da condensação, painel de suporte).
TTooppooqqeevvtthhsshh ssttoo ppaavvttwwmmaa..
Diplwvste to montevlo diavnoixh" opwvn, alfadiavste to kai tonivste
ta shmeiva ovpou qa anoicqouvn oi opev"
(swlhvne"-swlhvna" exaerismouv-bavsh sthvrixh").
I
EG
F
D
E
P
GR
I
EG
F
D
E
P
GR
INDOOR UNIT •
UNITÀ INTERNA
• UNITE INTERIEURE •
INNENEINHEIT
• UNIDAD INTERIOR •
UNIDADE INTERIOR
EESSWWTTEERRIIKKHH MMOONNAADDAA
29


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Argo FC - FCIAS8DC at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Argo FC - FCIAS8DC in the language / languages: English, German, French, Italian, Portuguese, Spanish as an attachment in your email.

The manual is 5,21 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Argo FC - FCIAS8DC

Argo FC - FCIAS8DC User Manual - English - 16 pages

Argo FC - FCIAS8DC User Manual - German - 16 pages

Argo FC - FCIAS8DC User Manual - French - 16 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info