8
TUBING LENGTH AND ELEVATION DIFFERENCE LIMITS
No additional charge of compressor oil is necessary.
L Tot. = Total tubing length (L1 + L2 + L3...)
Ln = Maximum tubing length of a single indoor unit (n=1,2,3...)
REQUIRED AMOUNT OF ADDITIONAL REFRIGERANT
For tubing 1/4 “ - 3/8” = 15g/m
For tubing 1/4 “ - 1/2” = 20g/m
For tubing Emix (3/8”) = 15g/m
LIMIT OF ELEVATION DIFFERENCE - OUTDOOR UNIT/INDOOR UNIT: 10m (H1, H2, H3, H4, H5, H6)
LIMIT OF ELEVATION DIFFERENCE BETWEEN INDOOR UNITS: 5m (H)
1.Standard screwdriver
2.Phillips head screwdriver
3.Knife or wire stripper
4.Tape measure
5.Level
6.Sabre saw or key hole saw
7.Hacksaw
8. Core bits ø 5
19.Hammer
10.Drill
11.Tube cutter
12.Tube flaring tool
13.Torque wrench
14.Adjustable wrench
15.Reamer (for
reburring)
16.Hex. key
Tools required for installation (not supplied)
1. REDUCTION 1/2F - 3/8M + PIPE UNION 3/8
2. REDUCTION 3/8F - 1/2M + PIPE UNION 1/2 (2pcs for GR9FI110)
3. CONICAL COVER
4. DRAIN TUBE
ACCESSORIES SUPPLIED WITH THE UNIT
2
4
13
L Tot. (m) L n (m) L Tot. (m) L n (m)
MONO SPLIT 30 - 50 -
AEI1G80 DUAL SPLIT 40 30 65 30
AEI1G110 TRIAL SPLIT 40 30 65 30
QUADRI SPLIT 40 30 65 30
EG
REGULATION (EU) No. 517/2014 - F-GAS
The unit contains R410A, a fluorinated greenhouse gas with
a global warming potential (GWP) of 2087.50. Do not
release R410A into the atmosphere.
R410A: 2.99 kg / 6.24 Tonn.CO2 (AEI1G80)
R410A: 3.38 kg / 7.06 Tonn.CO2 (AEI1G110)