620411
50
Zoom out
Zoom in
Previous page
1/68
Next page
1
3
2
Master Slave Slave Slave
ACV Max
1 2 3 4 5 6
W
W
W
W
W
W
B
Br
4 5 6
1 2 3
1 2 3
4 6
1 2 3 4 5
X15
1 2 3 4 5
1 2 3 4 5 6 7
8 9 10
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
X11
6 7 8 9
10
1 2 3 4
5
6 7 8 9 10
1 2 3 4 5
16
17
15
3 4
1 2
X16
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10 11 12 13 14
W
R
Or
Bk
Bk
V
Bk
42 1 3 2 1 1 2 3 1 2 3 4 5 6
8 9 10 11 12
1 2 3 4 5
13
6
14
7
X2
1 2 3 4 5 6 7 8 9 10
W
R
Y
R
Y
W
6 7 8 9 10
1 2 3 4 5
X3
1 2 3 4 5 6 7 8 9 10 11 12
V
W
R
Bk
7 8 9 10 11
1 2 3 4 5
12
6
X1
Bk
2 31
1412 13
X12
X9
P14
12
X10
12 3
4
123
456
B
V
B
W
B
W
B
P13
B
Or
123
Bk
B
Y/Gr
W
Br
B
Br
Y/Gr
B
1 2 3 4 5 6 7 8
8 7 6 5 4 3 2 1
123456
123
5
F00
X100
W
ON / OFF
3
230 V ~ 50Hz
1
N
L
N
L
N
L
2
6
25
B
Y/Gr
Br
B
Y/Gr
Br
Br
B
Bk
B
Y/Gr
Y/Gr
Y/Gr
Y/Gr
Y/Gr
Y/Gr
Y/Gr
V
B
Y/Gr
W
B
Y/Gr
Br
B
Y/Gr
Br
B
Y/Gr
B
Or
Y/Gr
X101
18
20
19
21
24
4
B
W
B
V
Br
X20
26
X18
V
W
B
W
B
B
9 10 11 12 13 14 15 16
X100
7
Y/Gr
Y/Gr
5AT Fuse
5AT Fuse
5AT Fuse
BK
BK
Bk
Bk
R
Bk
Y
Y
R
R
W
W
V
Y
Bk
Bk
R
Bk
W
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
W
W
W
W
W
W
W
V
1 2 3 4 5
1 2 3 4 5
8
2 1
1
NTC 5
9
2 1
1
NTC 2
10
2 1
1
NTC 1
11
16 15 14 13 12 11 10 9
B
Br
Y/Gr
B
Br
B
Br
Y/Gr
P4 P3
FL
27
123
1
21234123456
X7
X4
X6
X5
Bus A
Bus - Ground
Bus B
0-10 Volt - Ground
0-10 Volt - Input
Cascade sensor - Ground
Cascade sensor - Input
NTC 3
NTC 4
1
2
22
23
4
5
6
System Control - ACVMax: 660Y2800 • B
en
50
EN
FR
NL
ES
IT
DE
PL
RU
CONFIGURATION OF CASCADE SYSTEMS  SOLO 2 PUMPS
CASCADE SYSTEM CONNECTION (4-BOILER CASCADE)
Set-up conditions
Gas conversion done as required
Boilers switched o using the ON/OFF master switch
External power supply closed
Gas supply closed
Master boiler of the system dened
Front panel of the boilers open (refer to the relevant procedure in the Installation, Operation and Mainte-
nance Instructions provided with the boiler)
Required accessories
Designation P/N QTY
Cascade connection wire harness 257F1166 3
Connection Procedure
Refer to the diagram below for a general cascade connection scheme.
1. Connect the 4-terminal end connector (3) of the cascade connection harness (1) to the X16 terminal (4)
of the electronic board on the Master boiler.
2. Route the wire harness as shown in (6).
3. Connect the 6-terminal end connector (2) of the cascade connection harness (1) to the socket located
at the bottom of the front panel of the boiler, accessing from underneath (5).
Follow-on tasks
1. Make all the heat demand connections (eg. Room thermostats, sensor connections (DHW sensor, Cas-
cade sensor) and pump connections to the Master appliance (see also following pages for the hydraulic
and electrical congurations).
2. Connect the local Slave appliance pumps.
3. Close the front panel of the boilers.
4. Perform Cascade start-up procedure, refer to “Cascade start-up process on page 51.
50


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for ACV Prestige Solo at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of ACV Prestige Solo in the language / languages: English as an attachment in your email.

The manual is 13,24 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info