524656
16
Zoom out
Zoom in
Previous page
1/26
Next page
ENFRRU PL DE IT ES NL
EN • 16
664Y5400B
INSTALLATION
DHW CONNECTION
The DHW tank must be pressurized before putting the
primary circuit (heating) under pressure.
The HeatMaster® boiler can be connected directly to the DHW circuit.
Flush the system before connecting the domestic hot water circuit.
The installation must be fitted with an approved safety group, comprised
of a 7 bar safety valve, a check valve and a shut-off valve.
During the heating process, the domestic hot water expands and the
pressure increases. As soon as the pressure exceeds the safety valve
setting, the valve opens and discharges a small quantity of water.
Using a hot water expansion vessel (2 liters at least) will prevent this
phenomenon and reduce the water hammer effect.
The hot water output may reach temperatures in excess of
60°C, which can cause burns.
ACV therefore recommends that you install a thermostatic
mixing valve immediately after the appliance outlet.
If stop valves are used in the domestic hot water system,
they can cause pressure changes when closed.
Use devices designed to reduce water hammer effect to
avoid this phenomenon.
1. Cold water supply valve
2. Check valve
3. Pressure reducing valve
4. Domestic hot water safety valve set at 7 bar
5. DHW circuit expansion vessel
6. DHW secondary pump (if fitted)
7. Thermostatic mixing valve
8. Draw-off tap
9. Draining valve
10. Stop valve for cleaning
11. Temperature relief valve (UK only)
1 2
3
4
5
2
6
7
8
9
10
11
I
O
EXAMPLE OF HEATING + STORAGE CONNECTION
Recommended for applications requiring a high peak flow.
I
O
EXAMPLE OF PARALLEL CONNECTION
Recommended for applications with a high constant flow.
I
O
I
O
I
O
EXAMPLE OF SERIES CONNECTION
Preferable for high-temperature applications with up to 3 units
I
O
I
O
I
O
16


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for ACV HEATMASTER 100 N at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of ACV HEATMASTER 100 N in the language / languages: English as an attachment in your email.

The manual is 8,48 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of ACV HEATMASTER 100 N

ACV HEATMASTER 100 N User Manual - German - 26 pages

ACV HEATMASTER 100 N User Manual - Dutch - 20 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info