620309
18
Zoom out
Zoom in
Previous page
1/42
Next page
SAFETY INSTRUCTIONS FOR THE INSTALLATION
General remarks
The connections (electrical, flue pipe, hydraulic) must be carried out in accordance
with current standards and regulations in force.
If the water drawing off point is far from the tank, installing an auxiliary DHW loop
can allow to get hot water more quickly at all times.
Essential recommendations for the correct operation of the appliance
The boiler must be installed in a dry and protected area.
Install the appliance to ensure easy access at all times.
To avoid any risk of corrosion, connect the stainless steel DHW production tank
directly to the earth.
Make sure to install a pressure reducing valve set at 4.5 bar if the mains supply
pressure is in excess of 6 bar.
The DHW circuit must be fitted with an approved safety group, comprised of a 7
bar safety valve, a check valve and a shut-off valve.
If works need to be performed (in the boiler room or close to the air vents), make
sure to turn off the boiler to prevent dust from entering and accumulating in the
boiler heating system.
Essential recommendations for safety
Install the boiler on a base made of non-combustible materials.
Make sure that all air vents are unobstructed at all times.
A condensation outlet connected to the sewer must be fitted close to the boiler
to prevent the condensation products from the flue pipe from running into the
boiler.
The horizontal flue pipes must be installed with a slight slope of 5 cm per meter,
so that the acid condensation water flows to a condensate recovery container and
does not damage the heating body.
Do not store any corrosive products, paint, solvents, salts, chloride products and
other detergent products near the appliance.
The flue pipe diameter must not be smaller than that of the boiler flue gas outlet
connection.
en
18
BNE 2 Condens : 664Y5900 • D
EN
FR
NL
ES
IT
DE
PL
RU
INSTALLATION
18


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for ACV BNE 2 Condens at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of ACV BNE 2 Condens in the language / languages: English as an attachment in your email.

The manual is 3,59 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of ACV BNE 2 Condens

ACV BNE 2 Condens User Manual - German - 42 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info