671770
24
Zoom out
Zoom in
Previous page
1/68
Next page
Installation and Service Manual Upsilon-Series
24
7.3 Connectingtheuegasoutlet-/airsupplysystem
Upsilon-boilers can be used both in an “open” and in “closed" system.
Open: The required combustion air is taken from the immediate environment (boi-
ler room). For this purpose, please comply with the applicable boiler room
ventilation regulations BS 6644.
WhenusingboilercategoryB23andB33asan'openboiler',theprotectiondegree
oftheboilerwillbeIPX0DinsteadofIPX4D.
A.O.Smithrecommendstheapplicationofanairlterontheairintakeoftheboiler
(availableasanaccessorywithart.nr.0310288).Ifnolterisplacedtheremustbe
adevice(eg.grid)ontheairintakeoftheboilertobeconstructedorttedsucha
waythatanobjectwithadiameterØ16mmcannotbepushedin.
Closed: The required combustion air is sucked in from the outside through a channel.
This improves installation possibilities within a building. In general, outside
air is cleaner than air from the boiler room.
The following ue gas outlet systems can be used for the Upsilon-boiler:
- Individual ue gas outlet
- Collective ue gas outlet under-pressure
- Collective ue gas outlet over-pressure
7.4 Individualuegasoutlet
Opting for an individual ue gas outlet is determined by:
- Favourable position of boilers with regard to outlet area (wall or roof)
- Limited space above the boilers
- Limited number of boilers
You may opt for:
- Roof terminal (pitched or at roof)
- Wall terminal
Whentheboilerisoperational,itproducesawhiteplumeofcondensation.This
condensationplumeisharmlessbutmaycausesomeinconvenience,particularly
inthecaseofwallterminal.Asaresult,roofterminalsarepreferred.
Inaclosedinstallation,roofterminalsshouldbeatthesameheightpreventingue
gasfrombeingsuckedinbytheotherboiler(recirculation).Outletsinrecesses
andnearerectedwallsmayalsobringaboutuegasrecirculation.Recirculation
hastobepreventedatalltimes.
A.O.Smith supplies the following roof and wall ducts:
0304264 Roof terminal Ø100 - 150
0302505 Wall terminal Ø100 - 150
Accessory options:
0306017 Lead roof tile ø150 for angled roof
0302509 Roof connection plate ø150 for at roof
We suggest you design a simple ue gas system and air supply system. For further
information about the available components of the ue gas and air supply system we
recommend you consult the A.O.Smith ue literature.
The A.O.Smith ue gas system is meant, and designed, solely for the use on A.O.Smith
central heating boilers adjusted to Nat gas or LPG. The maximum ue gas temperatures
are below 70°C (full load 80/60°C)
The proper operation may be adversely inuenced by changes of or adjustments to the
correct set up.
24


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for A.O. Smith Upsilon UB-70 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of A.O. Smith Upsilon UB-70 in the language / languages: English as an attachment in your email.

The manual is 9,91 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of A.O. Smith Upsilon UB-70

A.O. Smith Upsilon UB-70 User Manual - English - 2 pages

A.O. Smith Upsilon UB-70 Additional guide - English, Dutch - 2 pages

A.O. Smith Upsilon UB-70 User Manual - Dutch - 2 pages

A.O. Smith Upsilon UB-70 Installation Guide - Dutch - 72 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info