503275
11
Zoom out
Zoom in
Previous page
1/126
Next page
7.2 Conditions....................................................................... 53
7.2.1 Ambient conditions........................................................... 53
7.2.2 Maximum floor load.......................................................... 53
7.2.3 Water composition............................................................54
7.2.4 Working clearances...........................................................54
7.2.5 Storage tank working clearances........................................ 55
7.3 Installation diagram..........................................................56
7.4 Water connections............................................................ 57
7.4.1 Unvented water connections.............................................. 57
7.4.2 Vented water connections..................................................58
7.5 Gas connection.................................................................59
7.6 Solar heating system........................................................ 59
7.7 Venting system................................................................ 59
7.7.1 C13/C33 concentric systems.............................................. 61
7.7.2 C13/C33 parallel systems.................................................. 62
7.7.3 C43/C53/C63 systems.......................................................64
7.8 Electrical connections........................................................ 65
7.8.1 Preparation......................................................................66
7.8.2 Mains power.................................................................... 66
7.8.3 Optional electrical connections............................................67
7.8.4 Electrical connection of the solar heating system...................68
7.9 Commissioning.................................................................70
7.9.1 Filling..............................................................................70
7.9.2 Procedure for checking the supply pressure..........................72
7.9.3 Procedure for checking the gas control valve pressure........... 74
7.9.4 CO
2
adjustment............................................................... 75
7.9.5 Switching pressure measurement....................................... 77
7.9.6 Turn on the water heater...................................................78
7.10 Decommisioning...............................................................78
7.10.1 Turn off the water heater...................................................78
7.10.2 Draining.......................................................................... 78
8 Conversion of gas type.............................................................. 81
9 Settings.....................................................................................83
9.1 Operator interface............................................................ 83
9.2 Service program...............................................................83
9.2.1 Hysteresis....................................................................... 83
9.2.2 Display the error history.................................................... 84
9.2.3 Display the water heater history......................................... 84
0311753_SGS_28-120_II_UKUK_V2.0 , 2017-05-03 11
11


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for A.O. Smith SGS 100 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of A.O. Smith SGS 100 in the language / languages: English as an attachment in your email.

The manual is 5,92 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of A.O. Smith SGS 100

A.O. Smith SGS 100 User Manual - German - 128 pages

A.O. Smith SGS 100 Usermanual and installation guide - Dutch - 120 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info