503238
44
Zoom out
Zoom in
Previous page
1/96
Next page
Filling
44 Instruction manual ADMR
5
gis
5.1.2 Filling vented installations
Installation diagram
To fill the appliance, proceed as follows:
1. Open the stop valve (11) in the hot water pipe and, if present, the stop valves
(4) for the circulation pump (6).
2. Close the drain valve (9).
3. Open the nearest hot water draw-off point (14).
4. Open the stop valve (4) on the cold water side (A) so that cold water flows
into the appliance.
5. Completely fill the appliance. When a full water jet flows from the nearest
draw-off point, the appliance is full.
6. Bleed the entire installation of air, for example by opening all draw-off points.
7. The appliance is now under water supply pressure. There should be no
water coming out of the T&P valve (3). If this does happen, the T&P valve
might be defective or incorrectly fitted.
Legend
Only applicable numbers are
mentioned.
3. T&P valve
4. stop valve (recommended)
5. non-return valve (mandatory)
6. circulation pump (optional)
7. top to bottom circulation pump
(optional)
9. drain valve
10. manual gas valve (mandatory)
11. service stop valve (mandatory)
12. temperature gauge
(recommended)
14. hot water draw-off points
17. 3-way aeration valve
(recommended)
18. water tank
19. float valve
A. cold water supply
B. hot water supply
C. circulation pipe
D. gas supply
E. overflow pipe
H. overflow pipe
10
D
4
5
7
4
3
B
A
4
E
C
14
11
C
4
6
4
5
9
17
4
12
18
19
H
14
14
IMD-0141 R3
44


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for A.O. Smith ADMR135 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of A.O. Smith ADMR135 in the language / languages: English as an attachment in your email.

The manual is 2,5 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of A.O. Smith ADMR135

A.O. Smith ADMR135 User Manual - Dutch - 104 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info